715.07 Initiation of NSWF (FAM) |
Previous Policy |
___________________________________________________________
The start date for NSWF depends solely upon the day that NSWF is confirmed:
• If eligibility is determined on the 1st of the month, NSWF will start from the 1st of the month.
• If eligibility is determined after the 1st and on or before the 16th of the month, NSWF will start from the 16th of the month.
• If eligibility is determined after the 16th of the month, NSWF will start on the 1st of the next month.
References: He-W 696.02(d); He-W 671.01; He-W 670.04(a); He-W 670.04(c)-(e); 7 CFR 271.2