157 FAILURE TO REPORT A CHANGE (FSM) |
Previous Policy |
_____________________________________________________________
If an individual fails to report a change as required, recover any benefits that the individual was not entitled to receive. See Standards & Budgets, Part 621.
References: RSA 161:4-a,IV, 7 CFR 273.12(d), 7 CFR 273.18